Quick Opening Closure with Teeth Vertical installation | Project Ref. Hyperbaric chamber for pressure testing | Final installation UAE | DN – Design Pressure 14”/900 –120 barg
Pig Launcher and Receiver – Pipeline-Egypt-24”-900-–-169-barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. EPC4 First Gas Phase – Pig traps Launcher and receiver | Final installation Algeria | DN – Design Pressure 24”/900 –120 barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. Gas Pressure Reducing and Metering Station Rutenberg PRMS | Final installation Israel | DN – Design Pressure 30”/600 – 90 barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. Energia del Pacifico | Final installation Acajutla – El Salvador | DN – Design Pressure 34”/300 – 45 barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. Zubair Depot and Shuaiba Refinery | Final installation 20km southwest of Basrah, Southern Iraq | DN – Design Pressure 34”/300 – 47 barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. Petromasila – Kharir Field Final installation Yemen | DN – Design Pressure 10”/1500 –152 barg
Quick Opening Closure with Sector Horizontal installation | Project Ref. Natural Gas Lines Final installation Israel | DN – Design Pressure 46”/600 – 90 barg
Quick Opening Closure with Teeth Vertical installation | Project Ref. Anna Nery FPSO Marlim 2 Gas Treatment and utilities offshore Filters Final installation Campos Basin – Brazil | DN – Design Pressure 32”/600 – 66 barg – Stainless Steel
Quick Opening Closure with Sector Horizontal installation | Project Ref. Gas Pressure Reducing and Metering Station Sorek Metering Final installation Israel | DN – Design Pressure 20”/600 – 90 barg